Sign In

Adjala-Tosorontio logo

Skip Navigation LinksAdjala Tosorontio > Council > By-laws

​​By-laws​

 

 

Get Adobe Reader

2015 Final Tax Rate By-law
Animal Running at Large By-law
ATV By-law 17-14
Building By-law
Burn By-law 12-12
Canine Control By-law
Clean and Clear By-law 04-52
​Council Committee and Appointment By-law 16-18
Election Sign By-law 10-17
Employment Lands Zoning By-law 13-14
Fees & Charges By-law 16-36
Fencing By-law 05-40
Fill By-law
Fire and Emergency Services Fees and Charges By-law
Fireworks By-law 05-41
Kennel By-law 05-08
Licence and Regulate Refreshment Vehicles and Catering Trucks By-law 96-50 as amended
Municipal Water Rates By-law
Municipal Sewer Rates & Control of Discharges By-law
Nuisance By-law 15-28
Planning Fees By-law
Procedural By-law 16-19
Rental Fees for the Public Use of Municipality Facilities By-law
Restrict use of Motorized Vehicles By-law 15-30
Roads By-law
Sign By-law
​Site Plan Control Areas By-law 01-17 as amended
Swimming Pool Fencing By-law

 

Official Plan

Official Plan Review 2017

Current Official Plan 2000 Text

Schedules:

Schedule - A1Schedule - B6
​Schedule - A2Schedule - B7
Schedule - A3Schedule - C1
Schedule - A4​Schedule - C2
Schedule - A5Schedule - C3
Schedule - A6Schedule - C4
Schedule - A7Schedule - C5
​Schedule - B1​Schedule - C6
Schedule - B2Schedule - C7
Schedule - B3​Schedule - D1
Schedule - B4Schedule - D2
​Schedule - B5

OPA #3 (Oak Ridges Moraine) Text

Schedules:

​Schedule E-1, Oak Ridges Moraine Boundary
​Schedule E-2, Land Use Designations
​Schedule E-3, Significant Woodlands
Schedule E-4, Wetlands, Streams and Draft Wellhead Protection Areas
​Schedule E-5, Areas of Natural and Scientific Interest
Schedule E-6, Aquifer Vulnerability
Schedule E-7, Landform Conservation Areas
​Schedule E-8, Site Specific Land Use Designations


Township Adopted (not in force) 2008 Official Plan

Schedules - Adopted (not in force) 2008 Official Plan:

Schedule A-1Schedule B-9
Schedule A-2Schedule B-10
Schedule A-3Schedule C-1
Schedule A-4Schedule C-2
Schedule A-5Schedule C-3
Schedule A-6Schedule C-4
Schedule A-7Schedule C-5
Schedule B-1Schedule C-6
Schedule B-2Schedule E-1
Schedule B-3Schedule E-2
Schedule B-4Schedule E-3
Schedule B-5Schedule E-4
Schedule B-6Schedule E-5
Schedule B-7
Schedule B-8
 

OPA 15 (Everett Secondary Plan)

Supporting Documents:

      

EVERETT MASTER SERVICING PLAN

FINAL NOTICE OF COMPLETION
The Master Servicing Plan (MSP) report is organized into three (3) volumes with multiple parts as follows:

VOLUME 1:  MASTER SERVICING PLAN STUDY REPORT
Part 1 -    Everett Secondary Plan Master Servicing Plan Class Environmental Assessment
               Appendix A - Public Consultation
               Appendix B - Figures

VOLUME 2:  BACKGROUND STUDIES
Part 1 -    Concept Land Use Plan - Everett Secondary Plan
Part 2 -    Preliminary Hydrogeological Investigation
Part 3 -    Archaeological Study Report
Part 4 -    Natural Heritage Study Report
Part 5 -    Pine River Assimilative Capacity Study
Part 6 -    Natural Hazards Mapping

VOLUME 3:  MASTER SERVICING STUDIES
Part 1 -    Master Drainage Plan Study Report
Part 2 -    Sanitary Servicing Master Plan Study Report

VOLUME 3:  MASTER SERVICING STUDIES
Part 3 -    Water Servicing Master Plan Study Report
Part 4 -    Transportation Study Report

Public Comments and Responses 30 Day Review Period for the Everett MSP
Summary of Review Period Comments
Summary of Infrastructure Approvals

Zoning By-law 03-56

Zoning By-law 03-57

​​Zoning By-law 03-57

Schedule A1 - Adjala Lots 1-10
Schedule A2 - Adjala Lots 11-15
Schedule A3 - Adjala Lots 16-25
Schedule A4 - Adjala Lots 26-32
Schedule A5 - Tosorontio Lots 1-10
Schedule A6 - Tosorontio Lots 11-20
Schedule A7 - Tosorontio Lots 21-33,  
                     Sunnidale Lot 1
Schedule B1 - Colgan
Schedule B2 - Hockley
Schedule B3 - Loretto
Schedule B4 - Rosemont
Schedule B5 - Everett
Schedule B6 - Lisle
Schedule B7 - Glencairn
Schedule B8 - Highway 89