Sign In

Adjala-Tosorontio logo

Skip Navigation LinksAdjala Tosorontio > Everett Page

​​OPA 15 (Everett Secondary Plan)

Supporting Documents:

      

EVERETT MASTER SERVICING PLAN


FINAL NOTICE OF COMPLETION

The Master Servicing Plan (MSP) report is organized into three (3) volumes with multiple parts as follows:

VOLUME 1:  MASTER SERVICING PLAN STUDY REPORT

Part 1 -    Everett Secondary Plan Master Servicing Plan Class Environmental Assessment
               Appendix A - Public Consultation
               Appendix B - Figures

VOLUME 2:  BACKGROUND STUDIES

Part 1 -    Concept Land Use Plan - Everett Secondary Plan
Part 2 -    Preliminary Hydrogeological Investigation
Part 3 -    Archaeological Study Report
Part 4 -    Natural Heritage Study Report
Part 5 -    Pine River Assimilative Capacity Study
Part 6 -    Natural Hazards Mapping

VOLUME 3:  MASTER SERVICING STUDIES

Part 1 -    Master Drainage Plan Study Report
Part 2 -    Sanitary Servicing Master Plan Study Report

VOLUME 3:  MASTER SERVICING STUDIES

Part 3 -    Water Servicing Master Plan Study Report
Part 4 -    Transportation Study Report

Public Comments and Responses 30 Day Review Period for the Everett MSP
Summary of Review Period Comments
Summary of Infrastructure Approvals